Ali Civil was engaged by Shoalhaven City Council to undertake a subdivision road frontage project at Wool Road St Georges Basin. The project involved installing kerb and gutter, driveway laybacks, open side kerb entry unit, pram ramp. Replacing the existing concrete headwall to suit drainage outlet levels to existing road surface and kerb. The project was completed with a 2-coat pavement finish. The client was pleased with the finished result.